The floating block connection part visual inspection to be done carefully 1. The swivel bolt and lock-nut and spring pin visual inspection to be done. 1.1 Every year : to be inspected by annual safety surveyor 1.2 Every month : visual check by ship's crew
2. Recommended remained screw : 2 threads to be seen above the lock nut 3. Much rusted spring pin is to be replaced with 8mm dia new pin 4. Suspension Link crack visual check to be done

Read also B. Lifeboat Davit inspection related regulations
Download attached file